Capaxis - Rope Access Specialists
home > references > case study 3

Concrete survey and repair : industrial rope access vs. mobile platform
Ganshoren, Brussels, Belgium                                             View next case study



The brief was as follows:
 
Check all panels on southern
  elevation
Note and photograph areas of
  concern
Remove loose material
Fix panels where necessary

 
Options: Mobile platform or Rope Access
TASK
Mobile platform
  Set up 8 hours
  Task 22 hours
  Clear 6 hours
Capaxis
  Set up 1 hour
  Task 24 hours
  Clear 1 hour

TOTAL
36 hours
26 hours


Value
Industrial rope access is the solution of choice due to the flexibility of the system.
With no need for permits, or flat stable ground beneath the work area, the whole project is much less complicated. Industrial abseiling is still more cost-effective as there is no separation between the access method and the works being done.

Once again, the client was very happy with his first use of rope access.


Consult our references or contact us directly for a no-obligation consultation and see for yourself how industrial rope access can be the solution you are looking for!
 

back to top