Case study 5
Air sealing using industrial rope access
Galaxy Buildings, Brussels, Belgium
The brief was as follows:
- Air-seal 16 internal ducts, throughout full depth of 28 storeys
- Pressure tested successfully on contract completion without one failure
Client asked us to repair his external banners during the contract.
Options: Rope Access
Value
Air leakage is the unintended infiltration of air through the building envelope. We were asked to complete this air duct sealing process on the new-build twin towers of North and South Galaxy. Each duct was approximately 2.5m by 1m, and 130m deep - thus giving a particular access problem.
Client extremely happy with the task - for which there was no other solution but rope access.
Consult our references or view another case study to see how best rope access can benefit you.
Interested? Please This email address is being protected from spambots. You need JavaScript enabled to view it. directly for a no-obligation consultation and see for yourself how industrial rope access can be the solution you are looking for.