Case study 2
Weather sealing
Industrial rope access vs. cradle
Rue Malibran, Ixelles, Brussels
The brief was as follows:
- Silicone seal to masonry crack on rear elevation, 1.5m in length
- Inspection of surrounding brickwork for further problems
Options: Cradle or Rope Access
Cradle |
Capaxis |
|||
Erection | 7 hours | Set up | 1 hour | |
Task | 1 hours | Task | 1 hour | |
Dismantle | 5 hours | Clear | 1 hour | |
Total | 13 hours | 3 hours |
On this task, we saved the client over 75% in time and time is money.
Value
On this scale of task, rope access will always be unequalled by alternative means of access. The contract was completed quickly and efficiently, the client was extremely happy with the result (his first use of a rope access company). Capaxis' roots are in these types of contract, where our expertise allows us to solve the problem quickly and efficiently - and at minimum cost to the client.
"Your use of ropes allowed me to have a job well done, without delay and well within budget - most of all, it was great not having the hassle of installing scaffolding."
Olivier Vanderhaeghen (translated from French)
Consult our references or view another case study to see how best rope access can benefit you.
Interested? Please This email address is being protected from spambots. You need JavaScript enabled to view it. directly for a no-obligation consultation and see for yourself how industrial rope access can be the solution you are looking for.