Case study 3
Concrete survey and repair
Industrial rope access vs. mobile platform
Ganshoren, Brussels, Belgium
The brief was as follows:
- Check all panels on southern elevation
- Note and photograph areas of concern
- Remove loose material
- Fix panels where necessary
Options: Mobile platform or Rope Access
Mobile platform |
Capaxis |
|||
Set up | 8 hours | Set up | 1 hour | |
Task | 22 hours | Task | 24 hours | |
Clear | 6 hours | Clear | 1 hour | |
Total | 36 hours | 26 hours |
Value
Industrial rope access is the solution of choice due to the flexibility of the system.
With no need for permits, or flat stable ground beneath the work area, the whole project is much less complicated. Industrial abseiling is still more cost-effective as there is no separation between the access method and the works being done.
Once again, the client was very happy with his first use of rope access.
Consult our references or This email address is being protected from spambots. You need JavaScript enabled to view it. directly for a no-obligation consultation and see for yourself how industrial rope access can be the solution you are looking for.